Perhaps nothing is more frightening for homeowners than discovering a major problem with the structure of their residence. Yet when you retain the services of a company with Palmer Custom Builders’ depth of experience in the field, even major challenges can be overcome quickly and efficiently.

Palmer’s Project Objectives and Challenges

  • The brick veneer wall of this 20-year-old home was pulling away from the framing of the house.

Solutions

  • Digging out the concrete footings at the base of the wall and hydraulically screwing jack piers into the ground to lift the wall back into its proper position.
  • To prevent future water entry behind the brick veneer wall, extra wood trim was installed and silicone caulking was done around the windowsills.
  • This project was completed in an astonishing two days.